Skip to content
Greenville SC Roof Pros
roofing in Greenville, SC

Greenville SC Roof Pros: Replacement, Leak Repair, Metal & Storm Work

Residential and commercial roofing across Greenville County. Free written quote, specified for your address rather than for an average one.

  • Registered roofing specialty contractor, South Carolina Residential Builders Commission
  • Written scope naming the rain band your address actually sits in
  • General liability and workers compensation sent direct from the carrier
  • Full tear-off to bare decking on every replacement, never a layover

Get a Free Quote

Fast response. No obligation.

or call (844) 511-2320

Why Greenville Chooses Greenville SC Roof Pros

  • We write two specifications for this county, not one, because the annual rainfall between Fountain Inn and Caesars Head is not remotely the same number.
  • Every job starts with moisture readings taken from inside the attic, on a set grid, so a slowly wetting deck is found before it gets covered up.
  • Deck replacement is priced per sheet on the proposal instead of hidden in an allowance you discover halfway through the tear-off.
  • We refuse three things by policy: layovers over old shingles, coatings sold as a replacement, and rolled asphalt put back on a low-slope porch.
  • Shaded planes get hand-sealed courses on winter installs, because a laminated shingle's adhesive strip will not bond under canopy in January.
  • Photographs of the deck, underlayment, valleys and flashings are dated and handed over before anything covers them, whether or not there is ever a claim.

How It Works

1

We look at the address first

Before the site visit we already know your elevation, your aspect and roughly how much rain your roof takes in a year. That decides which questions matter when we get there, and it stops us walking up with a single package we sell to everybody in the Upstate regardless of where they actually live.

2

Deck and attic, then the roof

We read the sheathing from underneath with a moisture meter on a set grid, photograph anything dark at the fastener lines, and only then walk the planes. Half the useful information about a Greenville roof is on the inside of it, and skipping that step is how a slowly wetting deck gets missed.

3

A scope you can price against

The proposal names the underlayment, the valley type, the fastening pattern, the flashing details and a per-sheet price for deck replacement. Nothing is written as an allowance you find out about on day three, and anything we are unsure of is listed as unknown with the range it could cost.

4

Install, clean, and a dated record

Crews tarp landscaping, magnet-sweep twice, and haul debris the same day. You get dated photographs of the deck, the underlayment, the valleys and the flashings before any of it was covered, plus the workmanship warranty and the registration number on one document.

Our Roofing Services in Greenville, SC

Roof Replacement in Greenville, SC

Roof Replacement

A replacement quote here should name your address before it names a shingle. Roughly fifty inches of rain reaches downtown in an average year and seventy-nine reaches Caesars Head, and one assembly does not belong under both totals.

Roof Leak Repair in Greenville, SC

Roof Leak Repair

The stain on your ceiling is a poor witness. Water entering a Greenville roof travels along rafters and down the underside of sheathing before it drops, and on a north plane that never fully dries it can travel for months before it drops anywhere.

Storm Damage Restoration in Greenville, SC

Storm Damage Restoration

The thing that lands on an Upstate roof is usually a tree. Piedmont clay holds water for days after a long soaking, and a saturated root plate lets a mature oak lean over in wind that would not have moved it in September.

Hail Damage Roofing in Greenville, SC

Hail Damage Roofing

Most of the calls we take about hail in Greenville County are not about hail. They are about a roof that looks beaten because it has been wet a great deal, and the difference decides whether filing helps you or hurts you.

Wind Damage Roofing in Greenville, SC

Wind Damage Roofing

Wind arriving off the Blue Ridge escarpment does not behave like a thunderstorm gust. Northwest flow spilling down a two-thousand-foot drop can push at the foothills for the better part of a day, and a roof that shrugs off a two-minute burst can lose its edges to that.

Roof Inspections in Greenville, SC

Roof Inspections

We start on the north slope. On a lot shaded by oak and hickory, the north plane of a Greenville roof gets a fraction of the drying hours the south plane gets, and it will show you the roof's real age years before the sunny side does.

Asphalt Shingle Roofs in Greenville, SC

Asphalt Shingle Roofs

Asphalt covers nearly every roof in this county, and the specification that matters here is not the wind rating on the wrapper. It is how quickly the shingle sheds water and how reliably its sealant strip bonds on a plane that spends much of the year damp and shaded.

Metal Roofing in Greenville, SC

Metal Roofing

Metal earns its price in this county for one reason above all others. A panel sheds a wet oak leaf and dries in minutes where a shingle plane under the same canopy holds litter and stays damp for days, and that difference compounds over thirty years.

Tile Roofing in Greenville, SC

Tile Roofing

On this one we generally end up talking customers out of the sale. Tile is a fine roof in a dry, warm climate and a difficult one in a place that pairs fifty to seventy-nine inches of rain with about sixty freezing nights a year.

Flat & Low-Slope Roofing in Greenville, SC

Flat & Low-Slope Roofing

The low-slope roof in Greenville is rarely a warehouse. It is a porch, a shed dormer, a carport tacked on in the seventies or a rear addition on a house built when the back of the property was not a design problem.

Roof Coatings & Sealing in Greenville, SC

Roof Coatings & Sealing

Coatings have a narrow, real use in the Upstate, and it is not the one advertised on the radio. Painting a liquid membrane over an asphalt shingle roof does not extend it here.

Roof Ventilation in Greenville, SC

Roof Ventilation

Ventilation here is a drying system, not a comfort system. The measure that matters is how fast a damp deck gives its moisture back, and in a county where annual rainfall ranges from about fifty inches to seventy-nine, that job is harder than the brochure assumes.

Skylights in Greenville, SC

Skylights

A skylight is a hole in the one plane of your house that has to stay watertight, and where you put it in Greenville matters more than which brand you buy. On a shaded north slope it can behave less like a window and more like a condensing surface.

Gutters & Downspouts in Greenville, SC

Gutters & Downspouts

Gutter capacity in this county is not a style question. A roof plane on the escarpment side sheds well over half again the water that the same plane sheds downtown, and a trough sized by habit rather than by area is why Upstate fascia boards rot from behind.

Fascia & Soffit in Greenville, SC

Fascia & Soffit

Fascia in Greenville rots from behind. The paint on the face can look serviceable from the driveway while the back of the board, sitting against a trough that stays full of packed needles, has been wet more or less continuously for years.

Chimney Flashing in Greenville, SC

Chimney Flashing

Half the chimney leaks we are called to in this county are not flashing leaks at all. The water is coming through the masonry itself, and replacing perfectly good metal will not stop a single drop of it.

Emergency Tarping in Greenville, SC

Emergency Tarping

A tarp in this rain band is a ten-day product, not a season's answer. We say that on the phone, because homeowners who are told otherwise are still living under blue plastic when the next long soak arrives and the water finds the seams.

Commercial Roofing in Greenville, SC

Commercial Roofing

Two kinds of commercial building dominate this market, and they fail in opposite ways. There is the converted textile mill with heavy timber decking and a nineteenth-century footprint, and there is the newer distribution box along the I-85 corridor with a steel deck and long, shallow drainage runs.

Insurance Claim Help in Greenville, SC

Insurance Claim Help

A fair number of these conversations end with us advising against a claim at all. A marginal loss on a roof with real remaining life costs you a deductible, a loss on your record and a harder renewal, and that arithmetic goes the wrong way more often than people expect.

What Greenville Customers Say

★★★★★
They measured the moisture in our attic before they ever got on the roof, then explained why our north slope was failing and the south one was not. First quote that actually explained something instead of listing brands.
Denise Whitmire · Travelers Rest
★★★★★
Told me my roof had four or five years left and to call back then. No pressure, no scare tactics. Called them when a limb came through the porch and they had it dried in the same afternoon.
Marcus Beddingfield · Simpsonville
★★★★★
We had two companies push a coating on our shingles. These folks said flat out it would trap water and void the warranty, then fixed the valley and two pipe boots for a fraction of what the coating cost.
Kathy Ruppert · Taylors
★★★★★
Deck replacement was priced by the sheet on the proposal, so when they pulled six bad panels I already knew the number. Cleaned up properly and sent photos of everything before it was covered.
Alvin Sudduth · Greer

Greenville SC Roof Pros covers roof replacement and leak repair, storm and wind damage, metal roofing, low-slope work, ventilation, gutters and flashing right across Greenville and the county around it. We work on architectural asphalt, standing seam metal, self-adhered modified membrane and clay tile, and we quote the assembly rather than a square number.

The reason we ask for your address before we talk price is that this county is not one climate. The state climatology office puts Greenville's average annual rainfall near fifty inches and Caesars Head near seventy-nine, and those two points sit about twenty-five miles apart. A roof that spends far more of the year wet needs a different underlayment, a different valley and a different drainage plan.

That is the whole idea behind how we write a scope. Two bands, two specifications, one honest explanation of which one your house sits in and why. It also means we will tell you when the upper-band package is money you do not need to spend, which happens more often on the south end of the county than most contractors will admit.

About Greenville SC Roof Pros in Greenville, SC

Greenville SC Roof Pros is a roofing company working across Greenville County and the foothill towns along the Blue Ridge escarpment. We do replacement, leak diagnosis, storm and wind repair, metal, low-slope, ventilation, gutters and flashing, on houses and on commercial buildings from converted mills to distribution space along the interstate.

What shapes how we work is the county itself. The rainfall total nearly doubles between the south end and the escarpment rim, so we stopped writing one specification and started writing two, and we explain on every proposal which band your address sits in and what that changes. It makes our quotes harder to compare line for line, and we think that is the right trade.

There are homeowners we are simply wrong for. If what you want is the lowest figure in the stack, or a bid that lines up item for item against the other three, call somebody else.

We will not lay a new roof over an old one, we will not coat shingles, and we will not put rolled asphalt back on a porch. If your roof has several good years left, we will write that down and go away, and you should be suspicious of anyone in this trade who never says it.

Recent Projects Across Greenville County and the Blue Ridge escarpment

roofing project in Greenville, SC — 1roofing project in Greenville, SC — 2roofing project in Greenville, SC — 3roofing project in Greenville, SC — 4
Commercial roofing services in Greenville, SC

Commercial roofing for mill conversions and the I-85 corridor

Greenville's commercial stock splits neatly into two problems. Converted textile mills carry heavy timber decking, a long history of previous repairs and moisture that takes forever to leave, so we core the deck before quoting and adhere rather than fasten where the substrate will not hold. Newer distribution buildings along the interstate carry huge water volume across shallow fields, where drainage and overflow provision decide everything.

  • Core cuts and a written deck report before any commercial number is quoted
  • Tapered insulation designed to move standing water off shallow fields
  • Overflow and secondary drainage checked against the volume the field carries
  • Reflective single-ply, SBS modified and coating restorations quoted side by side
  • Adhered systems where old timber and plank decking will not hold fasteners
  • Rooftop penetration inventory with photographs on every maintenance visit
  • Night and weekend work for occupied retail, clinical and warehouse space
  • Budget planning that gives you a remaining-life figure in years, not a scare

Frequently Asked Questions

Why would two houses a few miles apart get different roof specifications?

Because the rain totals really are different. South Carolina's climate office records about fifty inches a year at Greenville and about seventy-nine at Caesars Head, and this county holds both. A deck that stays damp for many more hours a year justifies a self-adhered underlayment across the whole plane and open metal valleys. On the south end, that same package is an upcharge we would rather you kept.

Does South Carolina license roofing contractors?

No. The state registers residential specialty contractors through the Residential Builders Commission once a job passes five hundred dollars, and no trade examination is attached to that registration. A certificate tells you paperwork was filed, not that anybody was tested. Ask for the registration number, ask for the insurance certificate direct from the carrier, then read the written scope, which is where the real difference between two bids sits.

Who is responsible for pulling the permit on a reroof?

Permitting runs through Greenville County Codes Enforcement for unincorporated addresses and through the City of Greenville permit center inside the city limits, and other municipalities in the county run their own. Work is built to the 2021 South Carolina Residential Code, effective January 2023. Obtaining it is our job and not yours to chase, and its number is printed on the paperwork handed back to you when the work closes out.

My north side is covered in moss and the south side looks fine. Is that normal?

It is normal here and it is worth acting on. A shaded plane under hardwood canopy gets a fraction of the drying hours the sunny plane gets, so it ages faster and grows moss that holds a mat of litter behind it. We clear it dry with a brush rather than pressure washing, which strips granules, and then deal with the actual cause, which is airflow and overhanging limbs.

Can a coating buy me a few more years out of a shingle roof?

Not on shingles, and not here. A coating seals a shedding assembly that is already struggling to dry, most manufacturers void their coverage over it, and with roughly sixty freezing nights a year the film takes on water and lifts. Coatings are legitimate on sound metal panels and on weathered low-slope membrane. We will quote those gladly and we will talk you out of the other.

How fast can you get a tarp on after a tree comes down?

Same day across most of the county when there is daylight and the pitch is workable. On a steep escarpment roof or a long private drive we bring anchors and rope and enough hands to do it safely, and if conditions say wait until morning we say so and protect the interior instead. No repair contract is required to get covered, and we never ask you to sign your claim over.

Call Now